Yearly Deck Maintenance Tips

February 13, 2014

Mid / Late Spring – Wash the Deck

Besides the deck looking dirty, one of the sure signs a deck needs a cleaning is a film of mold.  Left unchecked, the mold and dirt can trap moisture and start the rotting process.

Late Spring – Seal the Deck

The finish of your deck may be fading or chipping away.  This is natural because it is bare wood with a surface that sees the brunt of the harsh weather (Snow, Ice, Rain, Sun).  If your sealer or stain is obviously disappearing, now is a good time to wash and reseal your deck.

Mid Summer – Inspect and Repair your Deck

With the weather warm and dry, now is the perfect time to check for rotting.  Pay close attention to wood that is about 6 inches off the ground, close to your house or ground, and at the edges of the deck boards.

Areas of rot that are smaller than a silver dollar can be removed and then treated with a wood preservative, larger areas may need to have some wood replaced.

Early Fall – Preventive Measures

Now is the time to get tasks done that did not get done during the year.  Check the fasteners (Nails popping out), Wash and Seal your deck if it wasn’t completed and need to be done, and also check for rotting and loose boards.

ABOUT THE AUTHOR

Aaron Rouse: Founder & Design Architect

Aaron Rouse is the Founder of Deck & Drive Solutions and a seasoned architect with over 21 years of experience in deck building and design. He specializes in creating custom, high-quality outdoor living spaces across the Des Moines Metro Area.

More Posts

Best Composite Decking Material: The 2026 Definitive Buyer’s Guide
Read Article
How Much Does a Covered Deck Cost in Waukee, IA? (2026 Guide)
Read Article
How High Should the Railing on a Deck Be in Urbandale, IA: Building Codes
Read Article
Trex vs TimberTech: Which is the Best Choice for Your Deck?
Read Article
Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.