Up to 25% off  Labor For fall/winter/early spring builds!

Azek Vintage w Glass Rail

Azek Vintage with Glass Rail

Azek Full PVC Capped Decking (Vintage Series – Coastline), Westbury Full Aluminum Railing, Veranda Series – Black with Glass Railing which gives a perfect view to the neighborhood pond. and the Helical Piers. The helical piers, versatile, and environmentally friendly solution for stabilizing foundations and supporting heavy loads in a variety of deck construction projects.

Proudly built by Deck and Drive Solutions – Clive, IA.

Clive, Iowa
New Deck
Azek Full PVC Capped Decking (Vintage Series – Coastline), Westbury Full Aluminum Railing (Veranda Series – Black with Glass Railing), Helical Piers
2022

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until November 30TH **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by November 30, 2025. Projects must be started or completed by March 15, 2025. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.