Up to 25% off  Labor For fall/winter/early spring builds!

Black Ceiling under Deck

This deck was a Resurface area (walkway around the perimeter), then we build a new 24×16 for the main deck.  Originally (before we showed up) there was a patio and the rear of the house was not a walk-out.  The homeowner’s moved a bunch of dirt, did some rear foundation work and then installed a door out of the basement.  We then came in and did our magic.  Under the new deck section, we installed Trex Rain Escape and then lighting was installed.  We then came back and installed an aluminum ceiling in black color (Ironstone).  For the decking portion, we used Timbertech composite decking in Tigerwood for the main color than the picture frame board and accent around the perimeter was espresso.  The railing is Trex’s Aluminum Signature Railing in Black.  Deck lighting was also used with Trex Post Cap Lights and Trex Stair Riser Lights.

Timbertech PVC Capped Composite Decking (Legacy Series – Tigerwood for Main Decking and Legacy Series – Espresso for Picture Frame and Fascia), Trex Aluminum Signature Railing – Black, Trex Rain Escape, Trex Deck Lighting, Aluminum Ceiling Quality Edge – Ironwood

Johnston, IA
New Deck & Deck Resurface, Under Deck System, Deck Lighting
Timbertech PVC Capped Composite Decking (Legacy Series – Tigerwood for Main Decking and Legacy Series – Espresso for Picture Frame and Fascia), Trex Aluminum Signature Railing – Black, Trex Rain Escape, Trex Deck Lighting, Aluminum Ceiling Quality Edge – Ironwood
2023

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.