Up to 25% off  Labor For fall/winter/early spring builds!

Covered Patio with Cedar Ceiling

Covered Patio with Cedar Ceiling

This was a deck resurface project and what created this project was old deck would move up and down in the winter due to the footings in the ground.  It may not have been deep enough or very clay dirt in the certain area in Ankeny.  We had TechnoPost install the footings for the deck before we started.  Then we came and installed all new decking on the existing frame and rebuilt the stairs.  We also added railing to below the deck for a dog run.  Westbury Gates were installed on the deck as well as below in the dog run.  It was also time to become maintenance free so the product we chose was Timbertech’s PVC Capped Composite Decking.  The colors were from the Tropical Series with Antigua Gold for the main color then accented with the Antique Palm.  We then upgraded the railing to Westbury’s Full Aluminum Railing in the Rivera Series with Larger and Smaller posts to create a clean and custom look.  This deck looks great from inside the windows, on the deck, as well as from the golf course view.  We also did wrap the beam to finish it up.  This deck is the perfect setting for a busy day at work.

Ankeny, Iowa
Deck Resurface with New TechnoPosts
Timbertech PVC Capped Composite Decking (Tropical Series – Antigua Gold for Main Decking and Tropical – Antique Palm for Picture Frame and Fascia), Westbury Full Aluminum Railing (Rivera Series – Black), TechnoPost Footings
2019

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.