Up to 25% off  Labor For fall/winter/early spring builds!

Covered Timbertech Deck w/ New Ceiling

Covered Timbertech Deck w/ New Ceiling

This was a cool custom deck to build.  The original deck on this newer house was 14′ deep under the existing roof.  We enlarged the covered deck area to 16′ deep with angles.  Then we added the uncovered area to be larger with stairs and stair landing.  These improvements made the space larger for a more useful outdoor living area.  We installed a picture frame board of Timbertech’s Legacy Series – Mocha color for the boarder and then the main decking was a lighter color of Timbertech’s Legacy Series – Pecan.  We then upgraded the railing to a Westbury Full Aluminum Railing – Rivera Series with larger 4″ posts.  The existing posts that go to the ceiling, we wrapped with Westbury’s Post Sleeves 8″x8″ so the main roof posts matched the railing.  We also installed a Westbury Full Aluminum gate that matches the railing.  Last we installed a Car siding on the existing ceiling which some speakers were then added.  Great new useful living area with this deck project.  It turned out amazing with the color combination on the house and with the upgraded features.

Built By Deck and Drive Solutions a Timbertech Pro Platinum Builder – Urbandale, IA.

Urbandale, Iowa
Deck Resurface & Addition
Timbertech PVC Capped Composite Decking (Legacy – Pecan w/ Mocha), Westbury Full Aluminum Railing (Rivera Series – Black), Westbury Gate w/ Lock, Timbertech Deck Lighting w/ Transformer, Westbury 8” Post Sleeves, Pine Car Siding
2018

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until November 30TH **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by November 30, 2025. Projects must be started or completed by March 15, 2025. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.