Up to 25% off  Labor For fall/winter/early spring builds!

Large Cedar with Westbury

Large Cedar with Westbury

This deck turned out large and very useful.  The original deck on this house was 2 smaller decks with different levels.  Not very useful for large gatherings.  We then tore off the old deck and build a new 20×20 deck using cedar decking and an upgraded railing of Westbury Full Aluminum Railing (Tuscany Series).  We then installed a gate for the dog.  The homeowner already had the furniture planned out and in the mail before we started to build.  With the layout of the deck and the furniture placement, this deck is ready for many fun days and evening to enjoy!!

Des Moines, IA
New Deck
Cedar Decking & Westbury Full Aluminum Railing (Tuscany Series – Black), Westbury Gate
2018

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until November 30TH **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by November 30, 2025. Projects must be started or completed by March 15, 2025. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.