Up to 25% off  Labor For fall/winter/early spring builds!

New Composite Deck Construction

New Composite Deck Construction

With this project we tore off an old deck to rebuild a new deck with low maintenance.  The homeowner went with Timbertech’s PVC capped composite decking and Westbury’s black metal railing.  We also poured a new concrete patio below and added a dry space under his deck using a ZipUp UnderDeck System.  Timbertech’s Accent Deck Lighting was then added for ambiance and safety.

Built By Deck and Drive Solutions a Timbertech Pro Platinum  Builder – Des Moines, IA.

Des Moines, IA
Deck Design + Build
Timbertech PVC Capped Composite Decking w/ Black Westbury C10 Metal Railing
2013

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until November 30TH **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by November 30, 2025. Projects must be started or completed by March 15, 2025. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.