Up to 25% off  Labor For fall/winter/early spring builds!

Resurface Decking and Railing, then New Cedar Pergola

Resurface Decking and Railing, then New Cedar Pergola

This was a resurface job.  We kept the framing, but replaced all of the decking, skirting, and railing.  Then we added a cedar pergola above some of the deck and poured a new stamped and colored concrete patio below.  A hot tub was also wired in below the deck so then we added a ZipUp Underdeck System so below will stay dry in the wet seasons.  Timbertech Low-Voltage lighting was then added to finish the deck

Johnston, IA
Deck Design + Build
Timbertech PVC Capped Composite Decking, Timbertech Builder Rail, Cedar Pergola, Cedar Privacy Wall, ZipUp Underdecking System, Timbertech Low-Voltage Lighting
2013

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until November 30TH **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by November 30, 2025. Projects must be started or completed by March 15, 2025. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.