Up to 10% off  Labor For Spring Bookings!

Timbertech Antigua Gold with Antique Palm

Timbertech Antigua Gold with Antique Palm

This deck was a Deck Resurface Project with a Stair and Stair Landing Change.  The original deck design had an odd middle stair landing with (2) sets of stairs from a single landing.  It created an awkward area.  Also the original decking was Cedar which had many soft spots.  We tore off the old decking and installed new Composite Decking, then redesigned the main stairs with a landing that resembled a bridge which made it more comfortable to walk from the main deck to the hot tub area below.  The house was a Tuscany style house, so we wanted the colors and railing style to go along with the house’s theme.  The decking we used was Timbertech’s PVC Capped Composite Decking.  The main color was Antigua Gold and then accented with a double picture frame of Antique Palm.  The railing was upgraded to the Westbury’s Full Aluminum Railing with the Tuscany Series (Double Top Rail).  Also because it was next to the pool, we added a Drink Rail to the top of the rail so there would be an easy way to hold your drink while standing at the rail looking at the pool.  The total deck design became more simple design which turned out great with the style and usability of the outdoor space.  We built this deck in the Winter, so now it’s all ready for the Pool Season of 2019!!

Urbandale
Deck Resurface w/ New Stair Design
Timbertech PVC Capped Composite Decking (Tropical Series – Antigua Gold for Main Decking and Tropical Series – Antique Palm for Picture Frame and Fascia), Westbury Full Aluminum Railing (Rivera Series – Bronze), Westbury Drink Rail w/ Timbertech Antique Palm
2019

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 10% off  Labor

For Spring Bookings

Ask for more details

**Valid Until March 31st**

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by March 31, 2026. Projects must be started or completed by March 31, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.