Up to 25% off  Labor For fall/winter/early spring builds!

Timbertech Mocha with Westbury Bronze

Timbertech Mocha with Westbury Bronze

This was originally a pretty large deck that had stained wood that the solid stain kept pealing off and looked a bit used.  We then tore the complete deck off and rebuilt it with larger framing, and installed Low-Maintenance Material so there would be minimal maintenance.  The product we chose was Timbertech’s Legacy in Mocha color, then used Westbury’s Full Aluminum Railing (Tuscany Series) in Bronze Color.  These 2 colors went great with the color of their house.  Because the deck was close to the ground, we then installed Timbertech below to the frame to the ground to keep animals and kid’s toys from going under the deck.  The deck turned out great and their growing family will have many years of enjoyment on their new deck!!

West Des Moines, IA
New Deck
Timbertech PVC Capped Composite Decking (legacy Series – Mocha) and Westbury’s Full Aluminum Railing (Tuscany – Bronze)
2017

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.