Up to 25% off  Labor For fall/winter/early spring builds!

Timbertech Reserve Driftwood and Westbury Rivera

Timbertech Reserve Driftwood and Westbury Rivera

This Des Moines home is about a year old and was ready to have a larger deck the the original smaller “builder” size.  We tore off the old deck and build a new 16×12 deck using Timbertech Decking (Reserve Series) in the Driftwood Color.  This deck then got upgraded to the Westbury Railing in the Rivera Series – Black.  Finished it in December and homeowner was out grilling on it that same December Night.  This deck works out great for these homeowners and perfect for the neighbors and friends to swing by.

Built By Deck and Drive Solutions a Timbertech Pro Platinum Builder – Des Moines, IA.

Des Moines, IA
New Deck
Timbertech PVC Capped Composite Decking (Reserve Series – Driftwood), Westbury Full Aluminum Railing (Rivera Series – Black)
2020

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.