Up to 25% off  Labor For fall/winter/early spring builds!

Timbertech Sandy Birch and Brown Oak with Westbury Clay

Timbertech Sandy Birch and Brown Oak with Westbury Clay

This Rear Deck and Front Porch Project was one of our winter projects that we did for a great couple to work with!!  The existing decks were made of wood and had served it’s useful life.  It was time to start over.  We tore them both off and rebuilt the decks.  The homeowner’s wanted a maintenance free option, so we chose Timbertech’s PVC Capped Composite.  We were also trying to get a color that would be great to match the front’s Brick as well as the Siding.  We then decided to do a 2 tone color scheme on the deck for the 1st impression at the front of the house.  We picked a base color of Timbertech’s Terrain – Sandy Birch, then picture framed it with a darker board of Timbertech’s Terrain – Brown Oak.  Next we wanted the railing to go along with the brick’s grout color to tie all the colors together and make it look like it was designed at the same time with the house.  The railing was Westbury’s Full Aluminum Railing  with the color of Clay.  We built these decks this Winter, so they will be all ready for Spring to enjoy their new decks!!  The decks turned out great and the homeowner’s will love the low-maintenance materials so they can just enjoy!!

Built By Deck and Drive Solutions a Timbertech Pro Platinum Builder – Ankeny, IA.

Ankeny, Iowa
Build New Deck and Front Porch
Timbertech PVC Capped Composite Decking (Terrain Series – Sandy Birch w/ Brown Oak), Westbury Full Aluminum Railing (Tuscany Series – Clay Color)
2018

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.