Up to 25% off  Labor For fall/winter/early spring builds!

Timbertech Show Deck

Timbertech Show Deck

Timbertech PVC Capped Composite Decking (Legacy Series – Ashwood for Main Decking and Legacy Series – Espresso for 4 Board Picture Frame, Risers, and Fascia), Timbertech Fascia/Riser Entertainment Wall & Under Deck Skirting, Timbertech Impression Rail (Black), Timbertech Impression Gate (Black), Timbertech Post Cap Lighting w/ Timbertech Transformer, Stair Riser Lights, New Roof Extension w/ LED Lighting, Custom Built-In Kitchen w/ Stainless Steel Cabinets, Dekton Outdoor Countertop.

This Windsor Heights deck we played with a few different designs and materials.  My favorite is the 4 board picture frame in the center which separates the outdoor living areas.  The under deck skirt is 2 colors (Ashwood and Espresso) – but also did some decorative areas with where the beams stick out.  With the stairs, we did use the darker color and lighter color per each tread.  The outdoor kitchen with the built-in Black Stone and the 2nd TV Area was the icing on the cake.  This deck turned out amazing with many useful outdoor living areas.  This outdoor living area will be used quite a bit throughout the season.

Windsor Heights, IA
New Deck
Timbertech PVC Capped Composite Decking (Legacy Series – Ashwood for Main Decking and Legacy Series – Espresso for 4 Board Picture Frame, Risers, and Fascia), Timbertech Fascia/Riser Entertainment Wall & Under Deck Skirting, Timbertech Impression Rail (Black), Timbertech Impression Gate (Black), Timbertech Post Cap Lighting w/ Timbertech Transformer, Stair Riser Lights, New Roof Extension w/ LED Lighting, Custom Built-In Kitchen w/ Stainless Steel Cabinets, Dekton Outdoor Countertop
2022

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.