Up to 25% off  Labor For fall/winter/early spring builds!

Timbertech Stair off to Side

Timbertech Stair off to Side

Timbertech PVC Capped Composite Decking (Legacy Series) Pecan with Mocha Accent, Westbury Full Aluminum Railing (Tuscany Series), Westbury Lights and Stair Dot Lights.

Built By Deck and Drive Solutions a Timbertech Pro Platinum Builder – Ankeny, IA

Ankeny, Iowa
New Deck
Timbertech PVC Capped Composite Decking (Legacy Series) Pecan with Mocha Accent, Westbury Full Aluminum Railing (Tuscany Series), Westbury Lights and Stair Dot Lights
2020

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.