Up to 25% off  Labor For fall/winter/early spring builds!

Timbertech Walkout

Timbertech Walkout

This original deck has seen it’s day with deck stain.  It also had some framing issues.  We tore off everything minus the beam and posts (which were in great condition and level).  We then installed all new joists with some extra needed fasteners to match today’s codes.  We then installed Timbertech PVC Capped Composite Decking (Terrain Series – Brown Oak) and rebuilt the stairs.  We also installed Westbury’s Full Aluminum Railing to keep the view and update the look of the rear of the house.  The deck turned out great and the homeowners will have many years to enjoy the low maintenance deck!!

Built By Deck and Drive Solutions a Timbertech Pro Platinum Builder – Johnston, IA.

Johnston, Iowa
Deck Resurface w/ New Joists
Timbertech PVC Capped Composite Decking (Terrain Series – Brown Oak) & Westbury Full Aluminum Railing (Tuscany Series – Black)
2018

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.