Trex Deck with White Composite Pergola in Clive, Iowa

After years of dealing with the maintenance demands of an old wooden deck, the homeowners in Bondurant decided it was time for a change. They sought an outdoor space that was both practical and stylish, with minimal upkeep required.

Deck & Drive Solutions stepped in to tackle the project, addressing the need for a deck that could withstand the elements without the constant maintenance required by traditional materials. The goal was clear: create a durable space that would stay functional and comfortable under the hot sun.

The process began by removing the old wood deck and replacing it with Trex PVC Capped Composite Decking in Enhance Naturals – Coastal Bluff. This decking offers long-lasting durability while reducing heat absorption. A white composite pergola with black accent fasteners was installed above, designed to provide ample shade. Timbertech composite railings with metal spindles were added to complete the design, offering a clean, modern aesthetic.

The final result is an outdoor space that stays cooler in the sun, requires very little maintenance, and provides a comfortable area for relaxation and enjoyment. The homeowners now have a space that complements their home’s exterior and offers both style and practicality without the ongoing maintenance demands of the old wood deck.

Clive, Iowa
Deck Resurface and New Composite Pergola installation
Trex PVC Capped Composite Decking (Enhance Naturals – Coastal Bluff) Timbertech Composite Rail with Metal Spindles Composite Pergola (White)
2025

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.