Up to 25% off  Labor For fall/winter/early spring builds!

Wrap Around Deck

Wrap Around Deck

This growing family had a deck that was only 10 foot deep and wasn’t large enough for a family that entertains often.  They were looking for a new design with a larger deck.  We tore off the old deck and built a new 14′ deep deck and had it wrap around.  There was a nice tree in the way, so we built around the tree.  We also resurfaced their front porch to match the new deck.  They were also looking for a low-maintenance decking / railing.  The materials we choose was Timbertech’s PVC Capped Composite Decking and a Full Aluminum Westbury Railing.  To give the deck a custom look, we had some different angles in the decking.  The main decking is Timbertech’s – Legacy Pecan Color and then we picture framed it with Timbertech’s Legacy – Mocha.  We also upgraded the railing to a double rail from Westbury called Rivera.  Also we then added a Drink Rail on top of the rail with the Timbertech’s Legacy – Mocha deck board on top.  Next for the homeowner is to get new furniture to use the new outdoor space.  We built the deck after Thanksgiving, so when Spring comes – they will have all Spring/Summer/Fall to enjoy.  The homeowner’s love the new deck and will be used often for entertaining!!

Built By Deck and Drive Solutions a Timbertech Pro Platinum Builder – West Des Moines, IA.

West Des Moines, IA
New Deck
Timbertech PVC Capped Composite Decking (Legacy – Pecan & Mocha), Westbury Full Aluminum Railing (Rivera – Black), Westbury Drink Rail
2017

See More Projects

Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.