Up to 25% off  Labor For fall/winter/early spring builds!

Timbertech Certified – Quality Products

July 28, 2014
Timbertech Certification in Bronze 2014

Deck & Drive Solutions is certified by Timbertech Decking and Railing.  We have built many composite and low-maintenance decks and railings throughout the years and my personal favorite low maintenance decking choices are Timbertech and Gossen.  I am also a big researcher to find the best products to use on our projects.  We work closely with Gilcrest Jewett in Waukee so we also know about material news before many.  There are many different kinds of materials out there for decking, but I have my own expectations that I require before I trust a product.  The materials that we put on our projects, I personally have done research and physically installed it in the past, so I can test the products out.  I also check to see what new items are out there for fasteners or anything else to make a deck safer and/or to have a deck last longer.  For the framing part of the deck projects, on average, we build above and beyond the building codes.  It is nice that many of the building inspectors know who we are around the Des Moines Metro Area so we are able to get quick information when needed.

We stand on our craftsmanship for the construction of each project, as well as we work with only the materials that I am comfortable with.

ABOUT THE AUTHOR

Aaron Rouse: Founder & Design Architect

Aaron Rouse is the Founder of Deck & Drive Solutions and a seasoned architect with over 21 years of experience in deck building and design. He specializes in creating custom, high-quality outdoor living spaces across the Des Moines Metro Area.

More Posts

Best Composite Decking Material: The 2026 Definitive Buyer’s Guide
Read Article
How Much Does a Covered Deck Cost in Waukee, IA? (2026 Guide)
Read Article
How High Should the Railing on a Deck Be in Urbandale, IA: Building Codes
Read Article
Trex vs TimberTech: Which is the Best Choice for Your Deck?
Read Article
Deck Decisions, Done Right:
Smart planning meets smart savings.

Up to 25% off  Labor

For fall/winter/early spring builds

Ask for more details

**Valid Until January 1ST  **

Offer applies only to labor costs for the main composite deck build with railing on new or resurface projects only. Minimum project cost: $10,000. Additional options are billed at standards rates. Not valid with financing or combined with other promotions. Acceptance must be in writing (email, text, or signed document) by December 31, 2025. Projects must be started or completed by March 15, 2026. Scheduling depends on permits, material availability, and weather: early acceptance improves placement but does not guarantee a specific start date. Discount excludes demolition, repairs, and custom additions unless itemized. All work is performed by licensed professional under full liability coverage.